Friday, July 17, 2009

Concrete, Lights, Granite & Tile


Driveway


Back Patio


We now have lights!!




Granite being installed in the utility room.


Utility room granite.


Tile work in master bath.




Granite in kitchen



Thursday, July 2, 2009

July 1 Update


Electrical is run to the house and should be powered on by July 2 with lights.


Front Door with hardware.


Drive-way formed and ready for concrete. Concrete will be poured on July 2.



Patio formed and ready for concrete.

Forgot to mention - we only got one broken window from the rock layers. This will be replaced shortly.


AC vents were installed today in preparation to turn AC on before weeks end. Yeah...no more cleaning in the HOT Texas heat anymore.


Dryer vent installed.


Door hardware is all on.


Master Bath shower - detailed tile work in progress.




Microwave and vent hood installed.


More hardware


Dalton's Bath tile complete.


Dalton's Bath tile complete.


Dalton's Bath


Guest Bath tile work complete - waiting for tile on floor.

June 29 Update


Garage countertops are done


Garage countertops


On Monday June 29 we had a slight set back. We had two water leaks. This was the 1st one that occured in the garage and only affected the ceiling. It's amazing what just a little water can do. Luckily their were contractors on site and they shut the water off immediately before any significant damage occured. The leak was repaired the same day and water was turned back on to the house. This damage will be fixed starting July 6 with new sheetrock.


Water damage in garage due to leak in attic.


Water damage in garage.


Tile work in Master Bath.




Tile work around Master Bath Tub.




When I got to the house around 4:30 to take pictures and look at what had been done I walked into the office and discovered a 2nd water leak in the office closet. The water was dripping from the light fixture. By the time I made the discovery there was water damage to the exterior wall, ceiling, and cabinets. This will also be removed and new sheetrock installed. The cabinets will also be fixed or replaced depending on the extent of the damage starting July 6.


Water was accumulating on the concrete floor in the office closet.


Fireplace is now complete.


Rock work is now complete with the placement below the bar area.


Complete fireplace.


Guest Bath tile work almost complete.

June 27 Update


Master Bath - Ready for tile


Master Bath - ready for tile


Master Bath


Kitchen


Dalton's Bath - Tile in progress


Dalton's Bath


Guest Bath - Tile in progress


Dining Room