Thursday, July 2, 2009

June 29 Update


Garage countertops are done


Garage countertops


On Monday June 29 we had a slight set back. We had two water leaks. This was the 1st one that occured in the garage and only affected the ceiling. It's amazing what just a little water can do. Luckily their were contractors on site and they shut the water off immediately before any significant damage occured. The leak was repaired the same day and water was turned back on to the house. This damage will be fixed starting July 6 with new sheetrock.


Water damage in garage due to leak in attic.


Water damage in garage.


Tile work in Master Bath.




Tile work around Master Bath Tub.




When I got to the house around 4:30 to take pictures and look at what had been done I walked into the office and discovered a 2nd water leak in the office closet. The water was dripping from the light fixture. By the time I made the discovery there was water damage to the exterior wall, ceiling, and cabinets. This will also be removed and new sheetrock installed. The cabinets will also be fixed or replaced depending on the extent of the damage starting July 6.


Water was accumulating on the concrete floor in the office closet.


Fireplace is now complete.


Rock work is now complete with the placement below the bar area.


Complete fireplace.


Guest Bath tile work almost complete.

No comments: