As you can tell work continues to progress. The roof is now complete and the plumbers should finish today with all plumbing. The insulation and sheetrock is expected to begin on the 9th.
You know the winds were strong on Sat. the 28th of Feb if the porta' potty is on it's side. I hate to have been the person that had to clean this up on Monday.
Complete Roof Back Side.
Complete Roof Back Side.
The fireplace is actually complete. The remaining rock will be layed after the sheetrock is hung on the ceiling.
The orange dots represent where insulation will be placed on interior walls. All the interior bathroom walls and utility walls will be insulated for sound.
A nice clean living room and kitchen floor. I have learned that it does not stay clean for long.
A nice clean living room and kitchen floor. I have learned that it does not stay clean for long.
Breaker box. Look at all the wires.
Plumbing in the attic. The red hoses are hot water and the blue hoses represent cold water.
This is Ryan's request. There are two of these boxes strategically placed in the attic. All water lines run to a box whether it's cold or hot. This box alows us the opportunity to turn off water to a sink, toilet, washer, etc. if there is a leak, just needs to be shut off, or no longer is being used.
There are also two of these eco-friendly water heaters strategically placed in the attic. They are the Reni tankless water heaters. The water will heat on demand rather than stay heated when not needed.
Plumbing lines in master bath.
Plumbing lines in half bath and kitchen wall.
Plumbing in 3rd bath.
Shower/tub valve in 2nd bath.
No comments:
Post a Comment