Thursday, March 12, 2009

Hanging Sheetrock

Well after the foam insulation was blown in the sheetrock started moving. After about a day and a half the entire house is almost complete.



Stairways to attic

Garage

Utility Room

Hall Way

Master Bedroom

Master Bathroom


Master Bedroom

Living Room Ceiling

Kitchen

Front Entry

Office

Bedroom

Joint Bathroom

Bedroom



I have to comment on the insulation guys. The wet foam contractor that we used went around the entire house and caulked in between the 2x4's the exterior walls they sprayed insulation in. He wanted to seal any possible cracks. I can't tell you what an amazing job they did. They even cleaned up after themselves which I have not seen anyone else do. If you ever need an a reference I have one.

No comments: