Work continues on the inside and outside. During last week the kitchen was the main focus on the inside and the rock was the main focus on the outside. All the cabinets are now complete and will be measured for door and drawer fronts hopefully this week. The window trim, chair rail, baseboards, and crown molding are almost complete as well. It won't be long before we see painters.


















Not sure if I actually got a picture of the well before or not without the cover so here is a shot.


3rd load of rock


Kitchen and breakfast area looking from living room/hall


Kitchen looking from garage side hall entrance


Kitchen looking in from patio door


Kitchen directly looking from the living room



Kitchen from behind the bar


Office getting trimmed out


Living room right now


A snap shot of some of the crown molding that runs throughout the entire house


Master Bedroom - complete


Bedroom 1 - complete


Bedroom 2 - complete



Bedroom 3 / Game Room - complete


Guest / Hall Bathroom


Hallway - another snap shot of more crown molding as well


Hall closet - complete