Work continues on the inside and outside. During last week the kitchen was the main focus on the inside and the rock was the main focus on the outside. All the cabinets are now complete and will be measured for door and drawer fronts hopefully this week. The window trim, chair rail, baseboards, and crown molding are almost complete as well. It won't be long before we see painters.
Not sure if I actually got a picture of the well before or not without the cover so here is a shot.
3rd load of rock
Kitchen and breakfast area looking from living room/hall
Kitchen looking from garage side hall entrance
Kitchen looking in from patio door
Kitchen directly looking from the living room
Kitchen from behind the bar
Office getting trimmed out
Living room right now
A snap shot of some of the crown molding that runs throughout the entire house
Master Bedroom - complete
Bedroom 1 - complete
Bedroom 2 - complete
Bedroom 3 / Game Room - complete
Guest / Hall Bathroom
Hallway - another snap shot of more crown molding as well
Hall closet - complete
No comments: