Tuesday, May 26, 2009

Is It Done Yet?

More pics from over the weekend. The house continues to take shape both inside and outside. All the cabinets are now complete. Door fronts should arrive 6/1. Painters are scheduled to start filling in nail holes and joints on 5/27. Interior should be ready for floors and countertops in approx. 2 weeks. About 6 wks from completion. Yeah. It won't come fast enough. Stay tuned.








Additional shelves in office closet.
Additional shelves in office closet.
Dining room buffet area is completely trimed out with all molding.
Column to seperate rooms and provide a little extra support.
Still got some molding to complete throughout the kitchen, but the cabinets have been trimed out which makes a big difference.








Ironing board in master closet.

Master bathroom finally got its molding finished.
Utility room is finally trimed out with molding.

Cabinets in the garage.


More cabinets on the other side of the garage.

Tuesday, May 19, 2009

Progress Report

Work continues on the inside and outside. During last week the kitchen was the main focus on the inside and the rock was the main focus on the outside. All the cabinets are now complete and will be measured for door and drawer fronts hopefully this week. The window trim, chair rail, baseboards, and crown molding are almost complete as well. It won't be long before we see painters.


















Not sure if I actually got a picture of the well before or not without the cover so here is a shot.


3rd load of rock


Kitchen and breakfast area looking from living room/hall


Kitchen looking from garage side hall entrance


Kitchen looking in from patio door


Kitchen directly looking from the living room



Kitchen from behind the bar


Office getting trimmed out


Living room right now


A snap shot of some of the crown molding that runs throughout the entire house


Master Bedroom - complete


Bedroom 1 - complete


Bedroom 2 - complete



Bedroom 3 / Game Room - complete


Guest / Hall Bathroom


Hallway - another snap shot of more crown molding as well


Hall closet - complete

Thursday, May 7, 2009

More Cabinets

Work continues on the inside between trim, molding, cabinets and closets. Here are the latest tasks completed.

Master Closet


Master Closet

Master Closet

Master Closet

1/2 bath vanity

1/2 bath vanity


Dining Room Buffet Area

Office

Office (built-in filing cabinets)


Closet inside office for wrapping paper, quick gifts, etc.

Other half of closet inside office for scrapbooking storage and work area.

The kitchen is the next step. It's a blank canvas now.

Bedroom 1 closet

Bedroom 1 closet

Bedroom 2 closet

The garage is an absolute mess right now.