The plumbers started running drain vents on the 9th of February and the electricians started running electrical wires, telephone wires, and installing recessed lighting on the 11th of February. The exterior doors are on and the 1st load of rock arrived on February 13th. The 2nd load of rock arrived on February 16th. The painters are at the house today painting the exterior trim so the rock layer can begin. Here are more pictures. Sorry it's been a while since I uploaded pictures.
Inside look at front door
Electrical, TV and Phone wires
More trash and shavings from both electricians and plumbers
A peak at the 1st load of rock through the master bedroom window.
As you can see the wind is really creating a mess with the black paper. The roof can not be put on until the rock layer completes the fireplace and chimney. He was waiting on rock. The rock is here now we will wait on the rock layer so we can get the roof on.
The electricians have made several references to the number of plugs and switches. My anwser...there is never to many of either one.
The electricians have made several references to the number of plugs and switches. My anwser...there is never to many of either one.
PVC pipe is ready for the plumbers to run in the walls.
After an afternoon of sweeping shavings, dirt, etc. the house actually seemed clean. I was reminded that it would not stay that way long. I guess I know what I will be doing each weekend.