Monday, April 27, 2009

Exterior Rock



Front is almost rocked - 3 more sides to go.

Cabinets


Utility Room


Master Closet


Master Closet


Master Closet


Pantry / Hall Cabinets


3rd Bathroom


Front Bedroom - Windows trimed & baseboards on


Front Bedroom looking into 2nd (joint) bathroom.


Bedroom Closest


Back Bedroom trim


2nd Bathroom


2nd Bathroom

Monday, April 13, 2009

Exterior Rock

The rock guy mobilized on April 9 and will be on site approximately 3 weeks.










Cabinets, Doors, Trim

The interior trim and cabinet guy mobilized on April 7. He will be on site approximately 4 weeks. He has hung some interior doors, trim and started the master bathroom vanity.

















Water Well

Water...an important part of living. Harvey's Water Wells dug our well. They ended up drilling to 426' and finally hit water...good water...no iron...great pressure...all is good.









Mudding Floors


Living room floor mudded


Master shower recessed for water


Floors are all even now. The 2" recessed floors have been filled with additional mudd/concrete base.






The sand was hauled in by wheelbarrow




Mixed by hand






and layed by hand

Texture, Floors, Doors


Looking into kitchen. Remember how clean and open it looks, because it won't look like this again.


Floor plugs


Textured walls and clean floors (as clean as they can be)


Interior doors arrived


Trim and floor sander


Trim and cabinet wood